Hole 1173B | ||||||||||
Latitude: 32°14.6831´N | ||||||||||
Longitude: 135°01.4845´E | ||||||||||
Seafloor (drill pipe measurement from rig floor, mbrf): 4801.9 | ||||||||||
Distance between rig floor and sea level (m): 10.8 | ||||||||||
Water depth (drill pipe measurement from sea level, m): 4791.1 | ||||||||||
Hole 1173C | ||||||||||
Latitude: 32°14.6978´N | ||||||||||
Longitude: 135°01.4612´E | ||||||||||
Seafloor (drill pipe measurement from rig floor, mbrf): 4801.9 | ||||||||||
Distance between rig floor and sea level (m): 10.8 | ||||||||||
Water depth (drill pipe measurement from sea level, m): 4791.1 | ||||||||||
Operation | Start | End | Depth (mbsf) | Drilled (mbsf) |
Time on hole | Comments | ||||
Date (2001) |
Time (local) |
Date (2001) |
Time (local) |
Top | Bottom | Hours | Days | |||
196-1173B: | ||||||||||
Install reentry cone and 20-in casing | 10 May | 0224 | 13 May | 2315 | 0 | 124.2 | 124.2 | 88.5 | 3.69 | 20-in casing shoe at 120.6 mbsf; includes 43 hr due to reentry cone loss. |
LWD | 13 May | 2315 | 17 May | 2135 | 124.2 | 737.1 | 612.9 | 94.3 | 3.93 | Includes 24 hr spent evading tropical storm. |
Open
9![]() ![]() |
23 May | 1910 | 2 Jun | 0230 | 124.2 | 735.1 | 610.9 | 79.3 | 3.31 | 17![]() |
Assemble and drill in ACORK | 2 Jun | 0230 | 10 Jun | 0445 | — | — | — | 194.2 | 8.09 | ACORK extends from 0 to 727.10 mbsf; includes 58-hr DP transit back to site. |
RCB core below ACORK: Open basement hydrologic system to deepest monitoring zone | 10 Jun | 0445 | 12 Jun | 1615 | 737.1 | 756.6 | 19.5 | 59.5 | 2.48 | Three cores; 19.5 m cored; 5.19 m recovered (27%). |
Install bridge plug inside ACORK | 12 Jun | 1615 | 14 Jun | 0000 | — | — | — | 31.7 | 1.32 | Bridge plug set at 466 mbsf; drill pipe broke off at ACORK head. |
Conduct camera survey of ACORK | 29 Jun | 0400 | 29 Jun | 2215 | — | — | — | 18.3 | 0.76 | |
Totals for Hole 1173B: |
1367.5 | 565.8 | 23.58 | |||||||
196-1173C: | ||||||||||
LWD | 17 May | 2135 | 18 May | 1655 | 0 | 175.0 | 175.0 | 19.4 | 0.81 | |
Totals for Hole 1173C: | 175.0 | 19.4 | 0.81 | |||||||
Totals for Site 1173: | 1542.5 | 585.2 | 24.39 | |||||||
Hole 808H | ||||||||||
Latitude: 32°21.2142´N | ||||||||||
Longitude: 134°56.7009´E | ||||||||||
Seafloor (drill pipe measurement from rig floor, mbrf): 4686.0 | ||||||||||
Distance between rig floor and sea level (m): 10.9 | ||||||||||
Water depth (drill pipe measurement from sea level, m): 4675.1 | ||||||||||
Hole 808I | ||||||||||
Latitude: 32°21.2145´N | ||||||||||
Longitude: 134°56.7003´E | ||||||||||
Seafloor (drill pipe measurement from rig floor, mbrf): 4686.0 | ||||||||||
Distance between rig floor and sea level (m): 10.9 | ||||||||||
Water depth (drill pipe measurement from sea level, m): 4675.1 | ||||||||||
Operation | Start | End | Depth (mbsf) | Drilled (mbsf) | Time on hole | Comments | ||||
Date (2001) | Time (local) | Date (2001) | Time (local) | Top | Bottom | Hours | Days | |||
196-808H: | ||||||||||
Install reentry cone and 20-in casing | 18 May | 1937 | 20 May | 1910 | 0 | 126.7 | 126.7 | 47.5 | 1.98 | Mud motor failed; pulled out of hole; hole abandoned. |
Totals for Hole 808H: | 126.7 | 47.5 | 1.98 | |||||||
196-808I: | ||||||||||
Install reentry cone and 20-in casing | 20 May | 1910 | 22 May | 1130 | 0 | 160.1 | 160.1 | 40.3 | 1.68 | 20-in casing shoe at 156.6 mbsf. |
LWD | 22 May | 1130 | 27 May | 1710 | 160.1 | 1057.6 | 897.4 | 125.7 | 5.24 | Unable to penetrate past 1057.6 mbsf. |
Open
9![]() ![]() |
14 Jun | 0130 | 18 Jun | 1555 | 160.1 | 975.3 | 815.2 | 110.4 | 4.60 | |
Assemble and drill in ACORK | 18 Jun | 1555 | 28 Jun | 1945 | — | — | — | 243.8 | 10.16 | 964-m-long ACORK could only be drilled in to 927 mbsf; time on hole includes 17-hr DP transit back to site. |
Totals for Hole 808I: | 1872.7 | 520.2 | 21.68 | |||||||
Totals for Site 808: | 1999.4 | 567.7 | 23.66 | |||||||
Totals for Leg 196: |
3541.9 | 1152.9 | 48.05 |
Notes: LWD = logging while drilling, ACORK = Advanced CORK, RCB = rotary core barrel. DP = dynamic positioning. — = not applicable.