Table T1. Operations summary, Leg 196.
 
Hole 1173B









Latitude: 32°14.6831´N









Longitude: 135°01.4845´E









Seafloor (drill pipe measurement from rig floor, mbrf): 4801.9







Distance between rig floor and sea level (m): 10.8







Water depth (drill pipe measurement from sea level, m): 4791.1







Hole 1173C









Latitude: 32°14.6978´N









Longitude: 135°01.4612´E









Seafloor (drill pipe measurement from rig floor, mbrf): 4801.9







Distance between rig floor and sea level (m): 10.8







Water depth (drill pipe measurement from sea level, m): 4791.1







Operation Start End Depth (mbsf) Drilled
(mbsf)
Time on hole Comments
Date
(2001)
Time
(local)
Date
(2001)
Time
(local)
Top Bottom Hours Days
196-1173B:









Install reentry cone and 20-in casing 10 May 0224 13 May 2315 0 124.2 124.2 88.5 3.69 20-in casing shoe at 120.6 mbsf; includes 43 hr due to reentry cone loss.
LWD 13 May 2315 17 May 2135 124.2 737.1 612.9 94.3 3.93 Includes 24 hr spent evading tropical storm.
Open 9 -in LWD hole to 17 in for ACORK 23 May 1910 2 Jun 0230 124.2 735.1 610.9 79.3 3.31 17-in hole extends to 732.1 mbsf.
Assemble and drill in ACORK 2 Jun 0230 10 Jun 0445 194.2 8.09 ACORK extends from 0 to 727.10 mbsf; includes 58-hr DP transit back to site.
RCB core below ACORK: Open basement hydrologic system to deepest monitoring zone 10 Jun 0445 12 Jun 1615 737.1 756.6 19.5 59.5 2.48 Three cores; 19.5 m cored; 5.19 m recovered (27%).
Install bridge plug inside ACORK 12 Jun 1615 14 Jun 0000 31.7 1.32 Bridge plug set at 466 mbsf; drill pipe broke off at ACORK head.
Conduct camera survey of ACORK 29 Jun 0400 29 Jun 2215 18.3 0.76



Totals for Hole 1173B:

1367.5 565.8 23.58
196-1173C:









LWD 17 May 2135 18 May 1655 0 175.0 175.0 19.4 0.81



Totals for Hole 1173C: 175.0 19.4 0.81



Totals for Site 1173: 1542.5 585.2 24.39
Hole 808H









Latitude: 32°21.2142´N









Longitude: 134°56.7009´E









Seafloor (drill pipe measurement from rig floor, mbrf): 4686.0







Distance between rig floor and sea level (m): 10.9







Water depth (drill pipe measurement from sea level, m): 4675.1







Hole 808I









Latitude: 32°21.2145´N









Longitude: 134°56.7003´E









Seafloor (drill pipe measurement from rig floor, mbrf): 4686.0







Distance between rig floor and sea level (m): 10.9







Water depth (drill pipe measurement from sea level, m): 4675.1







Operation Start End Depth (mbsf) Drilled (mbsf) Time on hole Comments
Date (2001) Time (local) Date (2001) Time (local) Top Bottom Hours Days
196-808H:









Install reentry cone and 20-in casing 18 May 1937 20 May 1910 0 126.7 126.7 47.5 1.98 Mud motor failed; pulled out of hole; hole abandoned.





Totals for Hole 808H: 126.7 47.5 1.98
196-808I:









Install reentry cone and 20-in casing 20 May 1910 22 May 1130 0 160.1 160.1 40.3 1.68 20-in casing shoe at 156.6 mbsf.
LWD 22 May 1130 27 May 1710 160.1 1057.6 897.4 125.7 5.24 Unable to penetrate past 1057.6 mbsf.
Open 9 -in LWD hole to 17 in for ACORK 14 Jun 0130 18 Jun 1555 160.1 975.3 815.2 110.4 4.60
Assemble and drill in ACORK 18 Jun 1555 28 Jun 1945 243.8 10.16 964-m-long ACORK could only be drilled in to 927 mbsf; time on hole includes 17-hr DP transit back to site.



Totals for Hole 808I: 1872.7 520.2 21.68



Totals for Site 808: 1999.4 567.7 23.66



Totals for Leg 196:

3541.9 1152.9 48.05