Table T2. Stage 1 measurement-while-drilling operations summary for primary sites.
BT4-2A |
1.2 |
1.2 |
||
BT4-4A |
1.0 |
1.0 |
||
Transit 2 |
|
2.0 |
||
URS-3C |
1.0 |
1.0 |
||
URS-2C |
1.2 |
1.2 |
||
URS-1B |
1.9 |
1.9 |
||
8.3 |
Notes: MWD = measurement while drilling. The time estimates include rig-up through rig-down and stow.