Table of Contents

Table T1. Expedition 311 revised operations plan.
Proposed
site
Location
(latitude,
longitude)
Seafloor
depth
(mbrf)
Operations description
Port call
(days)
Transit
(days)
Drilling/
coring
(days)
Wireline
logging
(days)








Balboa, Panama
Start of Expedition 311
4.0 (In port)



Transit ~3800 nmi to Astoria, Oregon @ 10.5 kt
15.1
Astoria, Oregon (USA)
Science Party boards ship in Astoria
2.0 (In port)



Transit ~206 nmi to Site CAS-03B @ 10.5 kt
0.8
CAS-03B
48°37.058'N,
127°02.413'W
1791
Hole A: LWD/MWD to 300 mbsf
(BSR @ ~230 mbsf)
1.4



DP move ~2.8 nmi to Site CAS-02C @ 1.0 kt
0.0
CAS-02C
48°38.688'N,
126°58.993'W
2241
Hole A: LWD/MWD to 300 mbsf
(BSR @ ~230 mbsf)
1.1



DP move ~5.7 nmi to Site CAS-01B @ 1.0 kt
0.2
CAS-01B
48°41.884'N,
126°51.924'W
1336
Hole A: LWD/MWD to 380 mbsf
(BSR@~215 mbsf)
1.2



DP move ~0.8 nmi to Site CAS-06A @ 1.0 kt
0.0
CAS-06A
48°40.050'N,
126°51.053'W
1291
Hole A: LWD/MWD to 300 mbsf
(BSR @ ~215 mbsf)
1.0



DP move ~9.9 nmi to Site CAS-05D @ 1.0 kt
0.4
CAS-05D
48°47.367'N,
126°40.717'W
981
Hole A: LWD/MWD to 220 mbsf
(BSR @ ~130 mbsf)
0.8
Hole B: APC/APCT to ~200 mbsf
XCB/DVTP, PCS to TD @ 220 mbsf
2.2
Hole C: 2 APC cores, drill ahead
XCB/half-cores to TD (220 mbsf)
Pressure coring: PCS/HPC
Logging: triple combo and FMS-sonic
2.5
0.4



DP move ~9.9 nmi to Site CAS-06A @ 1.0 kt
0.4
CAS-06A
48°40.050'N,
126°51.053'W
1291
Hole B: APC to ~15 mbsf (2 MBIO cores)
0.3
Hole C: APC to ~15 mbsf (2 MBIO cores)
0.1
(Active Cold Vent)
Hole D: APC/APCT to ~200 mbsf
XCB/DVTP, PCS to TD (300 mbsf)
2.3
Hole E: 2 APC cores, drill ahead
XCB/half-cores to TD (300 mbsf)
Pressure coring: PCS/HPC
Logging: triple combo and FMS-sonic
VSP: 5 m spacing (12 h)
2.9
1.0



DP move ~0.8 nmi to Site CAS-01B @ 1.0 kt
0.1
CAS-01B
48°41.884'N,
126°51.924'W
1336
Hole B: APC to ~15 mbsf (2 MBIO cores)
0.3
Hole C: APC to ~15 mbsf (2 MBIO cores)
0.1
(Site 889)
Hole D: APC/APCT to ~200 mbsf
XCB/DVTP, PCS to TD (350 mbsf)
2.6
Hole E: 2 APC cores, drill ahead
XCB/half-cores to TD (350 mbsf)
Pressure coring: PCS/HPC
Logging: triple combo and FMS-sonic
VSP: 5 m spacing (13 h)
3.1
1.0



DP move ~5.7 nmi to Site CAS-02C @ 1.0 kt
0.3
Proposed
site
Location
(latitude,
longitude)
Seafloor
depth
(mbrf)
Operations description
Port call
(days)
Transit
(days)
Drilling/
coring
(days)
Wireline
logging
(days)
CAS-02C
48°38.688'N,|
126°58.993'W
2241
Hole B: APC/APCT to ~200 mbsf
XCB/DVTP, PCS to TD (300 mbsf)
2.9
(First Slope Basin)
Hole C: 2 APC cores, drill ahead
XCB/half-cores to TD (300 mbsf)
Pressure coring: PCS/HPC
Logging: triple combo and FMS-sonic
3.1
0.5



DP move ~2.8 nmi to Site CAS-03B @ 1.0 kt
0.1
CAS-03B
48°37.058'N,
127°02.413'W
1791
Hole B: APC/APCT to ~200 mbsf
XCB/DVTP, PCS to TD (300 mbsf)
2.7
Hole C: 2 APC cores, drill ahead
XCB/half-cores to TD (300 mbsf)
Pressure coring: PCS/HPC
Logging: triple combo and FMS-sonic
3.0
0.5



Transit ~134.0 nmi to Victoria @ 10.5 kt
0.6
Victoria, B.C., Canada
End of Expedition 311
18.0
33.6
3.4









Subtotal transit time:
18.0
Subtotal on site time:
37.0
Total operating days:
55.0
Total expedition including 6.0 days of port call(s):
61.0








Notes: DP = dynamic positioning. LWD = logging while drilling, MWD = measurement while drilling. BSR = bottom-simulating reflector, TD = total depth. APC = advanced piston corer, XCB = extended core barrel. APCT = APC temperature tool, DVTP = Davis-Villinger Temperature Probe. PCS = pressure coring sampler, HPC = HYACINTH pressure corer. Triple combo = triple combination tool string, FMS = Formation MicroScanner. VSP = vertical seismic profile. MBIO = microbiology sample. Seafloor depth is prospectus water depth + 11.0 m adjustment from water line to rig floor (i.e., drillers depth). Astoria is shown as a 2 day port call due to timing of port entry (crossing the Columbia Bar) and possibly increasing loading issues. Each deep cored hole has 16 h contingency to allow for hole instability, H2S, and hydrate handling slow-downs.

Table of Contents