|
Location (latitude, longitude)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Balboa, Panama
|
Start of Expedition 311
|
|
|
|
|
|
|
Transit ~3800 nmi to Astoria, Oregon @ 10.5 kt
|
|
|
|
|
Astoria, Oregon (USA)
|
Science Party boards ship in Astoria
|
|
|
|
|
|
|
Transit ~206 nmi to Site CAS-03B @ 10.5 kt
|
|
|
|
|
CAS-03B
|
48°37.058'N, 127°02.413'W
|
1791
|
Hole A: LWD/MWD to 300 mbsf (BSR @ ~230 mbsf)
|
|
|
|
|
|
|
|
DP move ~2.8 nmi to Site CAS-02C @ 1.0 kt
|
|
|
|
|
CAS-02C
|
48°38.688'N, 126°58.993'W
|
2241
|
Hole A: LWD/MWD to 300 mbsf (BSR @ ~230 mbsf)
|
|
|
|
|
|
|
|
DP move ~5.7 nmi to Site CAS-01B @ 1.0 kt
|
|
|
|
|
CAS-01B
|
48°41.884'N, 126°51.924'W
|
1336
|
Hole A: LWD/MWD to 380 mbsf (BSR@~215 mbsf)
|
|
|
|
|
|
|
|
DP move ~0.8 nmi to Site CAS-06A @ 1.0 kt
|
|
|
|
|
CAS-06A
|
48°40.050'N, 126°51.053'W
|
1291
|
Hole A: LWD/MWD to 300 mbsf (BSR @ ~215 mbsf)
|
|
|
|
|
|
|
|
DP move ~9.9 nmi to Site CAS-05D @ 1.0 kt
|
|
|
|
|
CAS-05D
|
48°47.367'N, 126°40.717'W
|
981
|
Hole A: LWD/MWD to 220 mbsf (BSR @ ~130 mbsf)
|
|
|
|
|
Hole B: APC/APCT to ~200 mbsf XCB/DVTP, PCS to TD @ 220 mbsf
|
|
|
|
|
Hole C: 2 APC cores, drill ahead XCB/half-cores to TD (220 mbsf) Pressure coring: PCS/HPC Logging: triple combo and FMS-sonic
|
|
|
|
|
|
|
|
DP move ~9.9 nmi to Site CAS-06A @ 1.0 kt
|
|
|
|
|
CAS-06A
|
48°40.050'N, 126°51.053'W
|
1291
|
Hole B: APC to ~15 mbsf (2 MBIO cores)
|
|
|
|
|
Hole C: APC to ~15 mbsf (2 MBIO cores)
|
|
|
|
|
(Active Cold Vent)
|
Hole D: APC/APCT to ~200 mbsf XCB/DVTP, PCS to TD (300 mbsf)
|
|
|
|
|
Hole E: 2 APC cores, drill ahead XCB/half-cores to TD (300 mbsf) Pressure coring: PCS/HPC Logging: triple combo and FMS-sonic VSP: 5 m spacing (12 h)
|
|
|
|
|
|
|
|
DP move ~0.8 nmi to Site CAS-01B @ 1.0 kt
|
|
|
|
|
CAS-01B
|
48°41.884'N, 126°51.924'W
|
1336
|
Hole B: APC to ~15 mbsf (2 MBIO cores)
|
|
|
|
|
Hole C: APC to ~15 mbsf (2 MBIO cores)
|
|
|
|
|
(Site 889)
|
Hole D: APC/APCT to ~200 mbsf XCB/DVTP, PCS to TD (350 mbsf)
|
|
|
|
|
Hole E: 2 APC cores, drill ahead XCB/half-cores to TD (350 mbsf) Pressure coring: PCS/HPC Logging: triple combo and FMS-sonic VSP: 5 m spacing (13 h)
|
|
|
|
|
|
|
|
DP move ~5.7 nmi to Site CAS-02C @ 1.0 kt
|
|
|
|
|
|
Location (latitude, longitude)
|
|
|
|
|
|
|
CAS-02C
|
48°38.688'N,| 126°58.993'W
|
2241
|
Hole B: APC/APCT to ~200 mbsf XCB/DVTP, PCS to TD (300 mbsf)
|
|
|
|
|
(First Slope Basin)
|
Hole C: 2 APC cores, drill ahead XCB/half-cores to TD (300 mbsf) Pressure coring: PCS/HPC Logging: triple combo and FMS-sonic
|
|
|
|
|
|
|
|
DP move ~2.8 nmi to Site CAS-03B @ 1.0 kt
|
|
|
|
|
CAS-03B
|
48°37.058'N, 127°02.413'W
|
1791
|
Hole B: APC/APCT to ~200 mbsf XCB/DVTP, PCS to TD (300 mbsf)
|
|
|
|
|
Hole C: 2 APC cores, drill ahead XCB/half-cores to TD (300 mbsf) Pressure coring: PCS/HPC Logging: triple combo and FMS-sonic
|
|
|
|
|
|
|
|
Transit ~134.0 nmi to Victoria @ 10.5 kt
|
|
|
|
|
Victoria, B.C., Canada
|
End of Expedition 311
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total expedition including 6.0 days of port call(s):
|
|
|
|
|
|
|
|
|
|