JA Daily Science Report for Expedition 309, 21 August 2005

 

LOCATION: Site 1256

 

SCIENCE UPDATE: RCB Bit #9 was laid out and a logging BHA made up. Hole 1256D was reentered for the eleventh time at ~0800 on 21 August. The bit was set approximately 6 m above the casing shoe and preparations were made for logging Hole 1256D. Planned logging operations include the triple combo, FMS, UBI, and WST (cetaceans and pinnipeds willing).