JA Daily Science Report for Expedition 312, 22 December 2005

 

LOCATION: Site 1256

 

SCIENCE UPDATE: After the FMS was recovered the UBI and Sonic tools were made up and run to 1430 mbsf. The hole was logged from 1430 to 1099 mbsf then a repeat pass from 1432 to 1079 mbsf was made. The FMS tool was repaired and redeployed to 1437 mbsf after which two passes up to 1099 mbsf were logged. A heave test on the Schlumberger logging winch was also conducted.