< Previous week | Next week >
IODP Expedition 321: Pacific Equatorial Age Transect 2
Week 6 Report (7-14 June 2009)
PDF file is available for download.
15 June 2009
Operations
Hole U1338B
Hole U1338B
officially began when the drill string cleared the seafloor at 1900 hr 6 June.
The drilling line was slipped and cut while offsetting the ship another 20
meters to the west of Hole U1338A. With the drill bit placed at 4208.0 m DRF to
optimize the core breaks between holes, the APC was deployed, and a water core
was recovered. After checking the drill string tally it was discovered that the
driller was off by a single joint of drill pipe. This single was added to the
string and with the bit positioned at the same depth, the 2nd hole for Site
U1338 (PEAT-8D) was spudded at 2330 hr 6 June. Core recovery with APC core 1H determined
the seafloor depth as 4209.9 m DRF. Except for a short drilled interval of 2.5
m to adjust the core breaks, continuous APC coring continued through Core 20H
to a depth of 188.1 m DSF using the FLEXIT core orientation system and
non-magnetic coring assemblies. FLEXIT and steel core barrels were then used as
APC coring continued through Core 42H to a depth of 387.4 m DSF. This was the
second deepest APC hole in scientific ocean drilling history surpassing the
378.0 m DSF depth achieved during Expedition 320 in Hole U1335B. APC extraction
overpull reached 100K pounds on 19 of the 42 total cores taken including the
last 11 cores. Full stroke was achieved on all but 2 cores (30H and 31H)
through the interval from 276.1 to 282.9 m DSF. The Core 1H liner was broken,
the liner for Core 13H was cracked at the bottom, and the liner in Core 42H was
recovered split. Average core recovery for the APC was 104.1%. Coring continued
with three XCB Cores 43X through 45X to a depth of 416.1 m DSF. The basement
contact was recovered in Core 45X and the XCB system recovered 57.9% of the
interval penetrated. Recovery was problematic with the XCB system and the
material that was recovered suffered significantly from the typical
"bisquiting" effect. Total depth of Hole U1338B was 4626.0 m DRF or 416.1 m DSF.
Overall core recovery using both APC and XCB coring systems was 100.9%. The
hole was swept clean with 50 barrels of attapulgite mud, a wiper trip revealed
no ledges or bridges, and there was no fill identified at total depth. The LFV
was locked open; the hole displaced with heavy 10.5 ppg logging mud, and the
end-of-pipe (EOP) was placed at 84.7 m DSF in preparation for logging. Wireline
logging in Hole U1338B was successfully concluded and all logging equipment was
rigged down by 1615 hr on 11 June 09. All logging with acoustic sources was
conducted during day light hours to conform to established mammal watch
protocols including pre-shooting mammal watch and soft start procedures for the
air guns. The drill string was then pulled back until the bit cleared the
seafloor at 1655 hr 11 June ending Hole U1338B.
Hole U1338C
The ship was offset 20 m to the west of Hole U1338B while the drilling line was slipped and cut and the Rigwatch drawworks/block position encoder was recalibrated. The drill
bit was placed at 4204 m DRF (same as for Hole U1338A) to optimize the core
breaks between Hole U1338B and Hole U1338C. The APC was deployed, and a water
core was recovered. Because 2.7 m of core had been recovered in Hole U1338A
with the same bit placement, it was suspected that vessel heave, induced by the
large long period swell train from the south, had impacted the core recovery.
The drill string was lowered another 3.0 m and the bit was re-positioned at
4207.0 m DRF. Hole U1338C was spudded at 2135 hr 11 June. Core recovery with
APC Core 1H determined the seafloor depth as 4212.7 m DRF. Continuous APC coring continued through Core 21H to a
depth of 189.8 m DSF using the FLEXIT core orientation system and non-magnetic
coring assemblies. FLEXIT and steel core barrels were then used as APC coring
continued through Core 44H to a depth of 396.9 m DSF. Indications were that
Core 45H fully stroked and drill-over was required to extract it from the
formation. Retrieval was delayed because a bent core barrel initially
prohibited entry into the drill string. Repeated jarring with the wireline jars
eventually sheared the overshot pit so the sinker bar string was recovered and
the FLEXIT core orientation tool was removed. The sinker bar assembly was
re-deployed and the core barrel was immediately recovered without any further
incident. It was deemed prudent at this point to leave the FLEXIT tool out of
the assembly for the remainder of the coring process. Coring continued through
Core 47H to a total depth of 414.4 m DSF setting a new all time depth record
for the APC. This surpassed the standing ODP record set on 7 August of 1992
(Leg 145) when the APC recovered 42 piston cores to a total depth of 398.3 m
DSF in Hole 882A. APC extraction overpull reached 100K pounds on Cores 22H
through 47H. Drill over prior to removal from the formation was required for 22
cores and full stroke was achieved on all but 4 cores (31H and 45H through
47H). Only two cores recovered with imploded liners (Cores 10H and 12H) however
several barrels were bent during the coring process and several piston rods had
to be adjusted and re-pinned due to over torqued threads that caused
miss-alignment of the rod grooves. Overall core recovery
for the APC was 104.4%. The drill string was pulled clear of the seafloor
at 2015 hr 14 June ending Hole U1338C.
Hole U1338D
Hole U1338D was a dedicated hole to recover a few practice cores to be used during the upcoming expedition. Hole U1338D was spudded at 2150 hr 14 June 2009 and Core 1H established
a seafloor depth of 4212.6 m DRF. Three APC cores were recovered to a depth of
23.9 m DSF. APC core recovery was 103.7%. Unofficial APC/XCB coring totals for
Site U1338 (PEAT-8D) include 139 total cores, 1261.9 m penetrated, 1220.41
meters recovered, for 96.7% recovery. The coring tools were then secured and
the drill string was pulled clear of the seafloor at 0145 hr 15 June. The top
drive was set back, the knobby joints were laid out, and recovery of the drill
string was begun.
Science Results
Hole U1338B and
U1338C was planned to target core gaps and several remaining areas beyond ~240
m CSF-A that needed full recovery. Hole U1338D was primarily planned to get few
"practice" cores to be used during the upcoming Bering Sea expedition.
The lithostratigraphy team
completed imaging and describing cores from Hole U1338A and U1338B. In Hole U1338C Cores 1H through 24H
have been imaged and described. Sediments are predominantly nannofossil ooze
containing minor but varying amounts of diatoms, radiolarians, and calcite
components. Several intervals of diatom-rich lithologies occur cyclically
within each hole. Cores are intensely bioturbated and mottled, with cm- to
dm-scale diagenetic color banding common throughout. Pyrite is a common
accessory mineral forming small burrow casts and disseminated in burrow-fill
sediments. Chert was recovered in Core U1338B-31H mostly as drilling breccia.
Near the base of each section, the dominant lithology recovered was nannofossil
chalk. In this lithology, manganese oxide was the most common accessory mineral
forming small accretions throughout most of the cores. A sharp color change
from pale green to yellow occurs several meters from the base of each hole.
Faulted yellowish brown nannofossil chalk directly overlies basement in each
hole. In Hole U1338B, a thin interval of dark brown of manganese oxide slurry
(XCB disturbance) was recovered about 1 m above basement. Small fragments of
weathered aphanitic basalt represent basement recovery at the base of each Holes
U1338 A and U1338B.
The section at Site U1338
appears continuous and contains a full suite of microfossils including
calcareous nannofossils, planktic and benthic foraminifers, radiolarians and
diatoms. The Miocene shows higher rates of sedimentation compared to the
Pliocene/Pleistocene section. The nannofossil, foraminiferal, radiolarian, and
diatom datums biostratigraphies are relatively well constrained and zonal
schemes generally agree throughout. The base of Hole U1338B is early Miocene in
age (~17.8 Ma). Calcareous nannofossil and foraminifer abundance and
preservation vary markedly through the sediment column, ranging from samples
dominated by calcareous microfossils to samples which are almost barren.
Nannofossil Zones NN4-NN21 are represented and the diverse assemblage is, in
general, moderately preserved. Radiolarians are well to
moderately preserved, except in the lowermost portion (early Miocene), which is
barren of radiolarians. Planktonic
foraminiferal assemblages are diverse and typical of tropical eutrophic
environments. Benthic foraminifers are overall well preserved, although
abundances fluctuate considerably depending on carbonate/silica content. The
abundance of the diverse diatom assemblages varies abundant to common
throughout and valves are moderately preserved.
Stratigraphic Correlation at
Site U1338 over the upper ~277 m CCSF-A is good. Poor recovery below this depth
in Hole U1338A made identification of a complete section more difficult and
some small gaps may be present below this level. Final identification of gaps
awaits full WRMSL measurement, core imaging, and comparison with downhole logs.
Natural remanent magnetization (NRM) of archive-half sections of all APC
cores from Holes U1338A and U1338B was measured, and measurements of APC cores
from Hole U1338C continue. The Flexit core orientation tool was deployed in
conjunction with all APC cores. Measurements of NRM above ~60 m CSF-A and
between 200 to 250 m CSF-A indicate moderate magnetization intensities with a
patchy but generally weak viscous (VRM) or isothermal remanent magnetic (IRM)
coring overprint, and polarity reversal sequences are usually clearly
recognized. Cores below ~300 m CSF-A also have moderate magnetization
intensities, but they are overprinted more strongly due to the usage of a steel
core barrel. Except for these depth intervals, remanence intensities after AF
demagnetization at peak fields of 20 mT are reduced to values close to
magnetometer noise level in the shipboard environment.
All discrete sample measurements of moisture and density and
velocity are completed for Hole U1338A. Hole U1338B was sampled to fill in gaps
of recovery in Hole U1338A, and analyses are in progress. Split core color reflectivity
measurements are completed through Core 321-U1338C-30H. Preliminary examination
of the data indicates that variation of all the physical properties largely
reflects the relative abundance of biogenic siliceous and calcareous
components. The greatest variability in properties is in the top 50 m of the
sediment section. Between 50 and 200 m, cycles in the abundance of siliceous
components are reflected in regular variations in bulk density, natural gamma
radiation, and magnetic susceptibility. Below 200 m CSF-A the sediment
properties are more uniform reflecting a more uniform and high carbonate
content.
Standard
geochemical analyses of IW and bulk sediment samples from Holes U1338A and
U1338B were completed. The high resolution interstitial water sampling has
revealed interesting features including large dissolved Mn and Fe peaks in the
upper 100 m CSF-A. The Ca and Si content of the bulk sediment samples mirror
each other precisely downhole. This demonstrates the importance of the biogenic
carbonate versus silicate production, or preservation, in determining the
sediment composition at the site.
Downhole logging operations in Hole U1338B started in the night of June
9 and ended in the afternoon of June 11.
Three logging strings were deployed. The Triple combo reached total hole
depth of 416.1 m DSF and good quality logs were obtained. The second logging
string consisted of the FMS-sonic tool. This tool string also reached total
depth of 416.1 m DSF. The third and final logging string consisted of the
Vertical Seismic Imager (VSI). This tool reached total hole depth and shooting
stations were conducted at approximately 15 m stations. The wireline heave
compensator was used throughout the deployment, and acceleration measurements
on the ship and in the tool string were taken to evaluate its performance. After acquisition, the log data were
transmitted to LDEO for further processing, and the processed data will be sent
back to the ship. Preliminary logging results established lithology around the "baby chert" layer, which is represented by an interval of high density
and resistivity.
Technical Support and HSE Activities
The shipboard labs continue to process cores and samples from Holes
U1337B and U1337C.
The assistant lab officers and mates conducted mammal watch
for VSI logging on June 11. No mammal was sighted throughout the entire period.
The Sercel gun cluster arrangement was used for VSP test. We received the
preliminary activity list for the San Diego port call, and began preparing
cores and other shipments going off in San Diego.
|