Next Section | Table of Contents

Table T1. Operations summary table for Site U1309 (30°10.1195'N, 42°07.1131'W; 1656.0 mbrf), Expedition 305.
Hole penetration
Number of cores
Interval cored
(m)
Core recovered (m)
Recovery (%)
Drilled/ washed (m)
Total penetration (m)
Time on hole
(h)
Time on hole (days)
U1309D-1
29
133.70
106.97
80.01
0.00
133.70
95.00
4.0
U1309D-2
23
110.40
91.77
83.13
0.00
110.40
80.50
3.4
U1309D-3
23
110.40
81.55
73.87
0.00
110.40
84.50
3.5
U1309D-4
18
81.60
71.10
87.13
0.00
81.60
83.00
3.5
Log bit
******Logging******
62.25
2.6
U1309D-5
17
81.60
69.75
85.48
0.00
81.60
79.75
3.3
U1309D-6
19
81.80
77.08
94.23
0.00
81.80
81.25
3.4
U1309D-7
21
100.80
88.60
87.90
0.00
100.80
82.50
3.4
U1309D-8
26
123.90
83.55
67.43
0.00
123.90
92.25
3.8
U1309D-9
21
100.80
62.00
61.51
0.00
100.80
90.00
3.8
U1309D-10
22
89.20
67.28
75.43
0.00
89.20
83.75
3.5
Log bit
******Logging******
55.50
2.3
Site U1309 totals:
219
1014.20
799.65
78.85
0.00
1014.20
970.25
40.4
Expedition 305 totals:
219
1014.20
799.65
78.85
0.00
1014.20
970.25
40.4

Next Section | Table of Contents