|
|
|
|
1.00
|
Drop beacon midway between Site 1253 and Site 1255.
|
1.00
|
Take up station over Site 1255 CORK-II.
|
8.00
|
Run in hole with BHA.
|
0.25
|
Run in hole with VIT.
|
0.50
|
Space out for BHA latch onto Site 1255 wellhead, load wireline into drill string.
|
1.00
|
Latch BHA onto Site 1255 wellhead.
|
0.50
|
Run in hole with wireline.
|
0.50
|
Jar/latch Site 1255 OsmoSampler.
|
0.75
|
Pull out of hole with wireline, unlatch BHA from Site 1255 wellhead.
|
0.50
|
Lay out Site 1255 OsmoSampler.
|
0.50
|
Load Site 1255 replacement OsmoSampler into drill string.
|
0.75
|
Run in hole with Site 1255 replacement OsmoSampler, latch BHA onto wellhead.
|
0.50
|
Latch Site 1255 OsmoSampler in place, release running tool.
|
0.75
|
Pull out of hole with wireline, unlatch BHA from wellhead, lay out wireline sinker bar.
|
0.25
|
Pull out of hole with VIT.
|
7.00
|
Pull out of hole with BHA (while making dynamic positioning move).
|
1.00
|
Dynamic positioning move from Site 1255 to Site 1253, take up station over Site 1253 CORK-II.
|
8.00
|
Run in hole with BHA fishing tool.
|
0.25
|
Run in hole with VIT.
|
2.00
|
Fish for Site 1253 OsmoSampler rope.
|
8.00
|
Pull out of hole with BHA fishing tool and Site 1253 OsmoSampler.
|
0.25
|
Pull out of hole with VIT.
|
2.00
|
Lay out Site 1253 OsmoSampler.
|
8.00
|
Run in hole with BHA.
|
0.25
|
Run in hole with VIT.
|
0.75
|
Space out for Site 1253 wellhead latch on, load replacement OsmoSampler into drill string.
|
0.50
|
Latch BHA onto Site 1253 wellhead.
|
0.25
|
Run in hole with Site 1253 OsmoSampler.
|
0.50
|
Jar/latch Site 1253 OsmoSampler into place.
|
0.75
|
Pull out of hole with wireline, unlatch BHA from Site 1253 wellhead.
|
8.00
|
Pull out of hole with BHA.
|
0.25
|
Pull out of hole with VIT.
|
0.00
|
Recover beacon (while pulling out of hole with BHA).
|
|
|
64.50
|
Total time (h)
|
2.69
|
Total time (days)
|