Table T2. Stage 1 measurement-while-drilling operations summary for primary sites.
|
BT4-2A |
1.2 |
1.2 |
||
|
BT4-4A |
1.0 |
1.0 |
||
|
Transit 2 |
|
2.0 |
||
|
URS-3C |
1.0 |
1.0 |
||
|
URS-2C |
1.2 |
1.2 |
||
|
URS-1B |
1.9 |
1.9 |
||
|
8.3 |
||||
Notes: MWD = measurement while drilling. The time estimates include rig-up through rig-down and stow.