Table T15. T2P Deployment 1, Hole U1319A.
| Event | Time (CDT) |
Description |
|---|---|---|
| 1 | 18:31:00 | Data logger started at 1 Hz |
| 2 | 20:46:00 | T2P on rig floor |
| 3 | 21:10:00 | T2P raised vertically |
| 4 | 21:10:20 | Pressure response chamber removed from T2P tip |
| 5 | 21:10:20 | Shroud in place over T2P tip |
| 6 | 21:11:19 | T2P placed in drill pipe |
| 7 | 21:13:00 | T2P connected to spacer |
| 8 | 21:16:16 | CDS connected to spacer |
| 9 | 21:16:43 | CDS in extended position |
| 10 | 21:20:05 | Start lowering T2P downhole |
| 11 | 21:32:35 | Stop at 511 mbsl |
| 12 | 21:35:00 | Start lowering probe |
| 13 | 21:41:27 | Stop at 1011 mbsl |
| 14 | 21:44:00 | Start lowering probe |
| 15 | 21:55:33 | Stop at 1388 mbsl |
| 16 | 22:01:30 | Start pulling T2P uphole |
| 17 | 22:16:59 | Stop at 1010 mbsl |
| 18 | 22:19:02 | Continue pulling T2P uphole |
| 19 | 22:23:05 | Stop at 511 mbsl |
| 20 | 22:25:09 | Continue pulling T2P uphole |
| 21 | 22:41:40 | T2P on rig floor |
| 22 | 22:41:52 | T2P tip in pressure response chamber |
| 23 | 22:46:46 | Pressure response test |
| 24 | 22:58:00 | Data downloaded from data logger |
| 25 | 23:40:00 | Battery removed from T2P |
Notes: Date = 6 June 2005. Depth = 1388 mbsl. T2P = temperature/dual pressure probe. CDS = colleted delivery system. CDT = central daylight time.
Previous | Close | Next | Top of page