Table T16. T2P Deployment 2, Hole U1319A.
| Event | Time (CDT) |
Description |
|---|---|---|
| 1 | 01:07:50 | Data logger started at 1 Hz |
| 2 | 08:13:28 | T2P on rig floor |
| 3 | 08:15:48 | T2P raised vertically |
| 4 | 08:16:10 | Pressure response chamber removed from T2P tip |
| 5 | 08:16:10 | Shroud in place over T2P tip |
| 6 | 08:19:38 | T2P placed in drill pipe |
| 7 | 08:20:11 | T2P connected to spacer |
| 8 | 08:23:54 | CDS connected to spacer |
| 9 | 08:25:15 | CDS in extended position |
| 10 | 08:26:52 | Start lowering T2P downhole, pumps on |
| 11 | 08:35:03 | Stop at 511 mbsl, pumps off |
| 12 | 08:37:20 | Start lowering probe, pumps on |
| 13 | 08:44:25 | Stop at 1012 mbsl, pumps off |
| 14 | 08:46:30 | Start lowering probe, pumps on |
| 15 | 08:52:39 | Stop at 1431 mbsl, pumps off |
| 16 | 08:55:05 | Start lowering probe |
| 17 | 08:58:20 | T2P passes through lockable float valve |
| 18 | 09:05:45 | CDS lands in BHA |
| 19 | 09:08:52 | Start penetration of T2P into sediment |
| 20 | 09:15:29 | End of T2P penetration |
| 21 | 09:27:03 | Pumps on at 10 spm |
| 22 | 09:47:30 | Start pulling T2P uphole |
| 23 | 09:48:50 | Stop pulling at 1509 mbsl |
| 24 | 09:49:30 | Pulling/releasing winch to free CDS from BHA |
| 25 | 09:52:20 | Start pulling T2P uphole |
| 26 | 10:09:04 | Stop at 511 mbsl, pumps off |
| 27 | 10:11:30 | Start pulling T2P uphole |
| 28 | 10:20:59 | CDS detached from wireline |
| 29 | 10:27:50 | CDS detached from spacer |
| 30 | 10:30:16 | Spacer detached from T2P |
| 31 | 10:30:50 | T2P on rig floor |
| 32 | 10:31:16 | T2P tip in pressure response chamber |
| 33 | 10:39:00 | T2P in workroom |
| 34 | 10:49:00 | Battery removed from T2P |
| 35 | 11:04:38 | T2P connected to direct-current power |
| 36 | 11:05:00 | Data downloaded from data logger |
Notes: Date = 7 June 2005. Depth = 81.37 mbsf. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. spm = strokes per minute. CDT = central daylight time.
Previous | Close | Top of page