Table T15. T2P Deployment 3, Hole U1320A.
| Event | Time (CDT) |
Event |
|---|---|---|
| 1 | Data logger started at 1 Hz | |
| 2 | 18:08:00 | T2P on rig floor |
| 3 | 18:14:00 | Pressure response chamber removed from T2P tip |
| 4 | 18:14:00 | Shroud in place over T2P tip |
| 5 | 18:15:00 | T2P connected to spacer |
| 6 | 18:17:00 | CDS connected to spacer |
| 7 | 18:22:00 | CDS in connected to wireline |
| 8 | 18:23:00 | Start lowering T2P downhole, pumps on |
| 9 | 18:30:00 | Stop at 511 mbsl, pumps off |
| 10 | 18:33:00 | Start lowering probe, pumps on |
| 11 | 18:40:00 | Stop at 1011 mbsl, pumps off |
| 12 | 18:43:00 | Start lowering probe, pumps on |
| 13 | 18:44:00 | Pumping at 13 spm |
| 14 | 18:50:00 | Stop at 1490 mbsl, pumps off |
| 15 | 18:53:00 | Start lowering probe, pumps on at 13 spm |
| 16 | 18:57:00 | Pumps off |
| 17 | 19:00:00 | CDS lands in BHA |
| 18 | 19:00:00 | Raising BHA to 2 m off bottom of hole |
| 19 | 19:02:00 | Start penetration of T2P into sediment, 2 m advance of BHA |
| 20 | 19:03:00 | End of T2P penetration |
| 21 | 19:04:00 | Raising BHA 3 m off bottom of hole |
| 22 | 19:07:00 | Pumping at 10 spm |
| 23 | 19:55:00 | Pulling T2P uphole slowly 10 m |
| 24 | 19:59:00 | 10 m pull completed |
| 25 | 19:59:00 | Start pulling T2P uphole, pumping at 10 spm |
| 26 | 20:05:00 | Stop at 511 mbsl, pumps off |
| 27 | 20:09:00 | Start pulling T2P uphole, pumps on |
| 28 | 20:13:00 | CDS detached from wireline |
| 29 | 20:16:00 | CDS detached from spacer |
| 30 | 20:18:00 | Spacer detached from T2P |
| 31 | 20:18:00 | T2P on rig floor |
| 32 | 20:18:00 | T2P tip in pressure response chamber |
| 33 | 20:26:00 | T2P in workroom |
| 34 | 20:46:00 | Battery removed from T2P |
| 35 | 20:46:00 | T2P connected to direct-current power |
| Data downloaded from data logger |
Notes: Date = 8 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.