Table T16. T2P Deployment 4, Hole 1320A.
| Event | Time (CDT) |
Event |
|---|---|---|
| 1 | Data logger started at 1 Hz | |
| 2 | 6:24:00 | T2P on rig floor |
| 3 | 6:29:00 | Pressure response chamber removed from T2P tip |
| 4 | 6:29:00 | Shroud in place over T2P tip |
| 5 | 6:31:00 | T2P in drill pipe |
| 6 | 6:32:00 | T2P connected to spacer |
| 7 | 6:34:00 | CDS connected to spacer |
| 8 | 6:37:00 | CDS in connected to wireline |
| 9 | 6:39:00 | Start lowering T2P downhole, pumps on |
| 10 | 6:44:00 | Stop at 511 mbsl, pumps off |
| 11 | 6:46:00 | Start lowering probe, pumps on |
| 12 | 6:52:00 | Stop at 1011 mbsl, pumps off |
| 13 | 6:54:00 | Start lowering probe, pumps on |
| 14 | 7:00:00 | Stop at 1471 mbsl, pumps off |
| 15 | 7:03:00 | Drill bit positioned 0.5ñ0.75 m off bottom of hole |
| 16 | 7:12:00 | CDS lands in BHA, probe in formation |
| 17 | 7:12:00 | Raising BHA 2.5 m |
| 18 | 7:17:00 | Pumping at 10 spm |
| 19 | 7:36:00 | Pulling T2P uphole to disengage CDS |
| 20 | 7:37:00 | Pulling T2P uphole |
| 21 | 7:51:00 | T2P tip at 372 mbsl |
| 22 | 7:54:00 | T2P lowered to 511 mbsl, pumps off |
| 23 | 7:56:00 | Pulling T2P uphole |
| 24 | 8:05:00 | CDS lowered to retracted position |
| 25 | 8:08:00 | CDS detached from spacer |
| 26 | 8:09:00 | T2P detached from spacer |
| 27 | 8:09:00 | T2P tip in pressure response chamber |
| 28 | 8:16:00 | T2P in workroom |
| 29 | Battery removed from T2P | |
| 30 | T2P connected to direct-current power | |
| 31 | Data downloaded from data logger |
Notes: Date = 9 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.
Previous | Close | Top of page