Previous   |    Close   |    Next

Table T21. T2P Deployment 22, Hole U1322C.

Event Time
(GMT)
Description
1   Data logger started at 1 Hz
2 22:18:46 Start lowering T2P downhole, pumps on
3 22:29:40 Stop at 491 mbsl, pumps off
4 22:31:51 Start lowering probe
5 22:35:38 Stop at 741 mbsl, pumps off
6 22:37:41 Start lowering probe
7 22:45:54 Stop at 1321 mbsl, pumps off
8 22:48:16 Start lowering probe
9 22:51:43 Stop at 1384 mbsl, pumps off
10 22:54:50 Start lowering probe
11 22:59:47 CDS lands in BHA; pumps off
12 22:59:57 Start penetration of T2P into sediment
13 23:00:52 End of T2P penetration; bit on bottom of hole
14 23:01:10 Raising BHA 4.0 m off bottom of hole
15 00:03:25 Pulling T2P uphole slowly with wireline
16 00:06:30 Stop at 1321 mbsl, pumps off
17 00:08:30 Pulling T2P uphole slowly with wireline
18 00:15:04 Stop at 741 mbsl, pumps off
19 00:17:14 Pulling T2P uphole slowly with wireline
20 00:20:20 Stop at 491 mbsl, pumps off
21 00:22:30 Pulling T2P uphole slowly with wireline
22 00:29:40 Wireline disconnected from CDS
23 00:31:25 CDS/spacer disconnected from spacer
24 00:32:42 T2P out of pipe
25   Data downloaded from data logger

Notes: Depth = 75.0 mbsf. Date = 30 June 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.