Table T22. T2P Deployment 23, Hole U1322C.
Event | Time (GMT) |
Description |
---|---|---|
1 | Data logger started at 1 Hz | |
2 | 6:51:00 | T2P on rig floor |
3 | 7:01:01 | Start lowering T2P downhole, pumps on |
4 | 7:09:59 | Stop at 491 mbsl, pumps off |
5 | 7:12:10 | Start lowering probe |
6 | 7:17:10 | Stop at 741 mbsl, pumps off |
7 | 7:19:30 | Start lowering probe |
8 | 7:29:29 | Stop at 1321 mbsl, pumps off |
9 | 7:43:31 | Start lowering probe |
10 | 7:52:12 | Stop at 1459 mbsl, pumps off |
11 | 7:54:02 | Start lowering probe |
12 | 7:58:21 | CDS lands in BHA; pumps off |
13 | 7:58:31 | Start penetration of T2P into sediment |
14 | 8:02:56 | End of T2P penetration; bit 1 m off bottom of hole |
15 | 8:03:30 | Raising BHA 4.0 m off bottom of hole |
16 | 9:05:35 | Pulling T2P uphole slowly with wireline |
17 | 9:12:44 | Stop at 1321 mbsl, pumps off |
18 | 9:14:59 | Pulling T2P uphole slowly with wireline |
19 | 9:24:45 | Stop at 741 mbsl, pumps off |
20 | 9:26:45 | Pulling T2P uphole slowly with wireline |
21 | 9:32:17 | Stop at 491 mbsl, pumps off |
22 | 9:34:17 | Pulling T2P uphole slowly with wireline |
23 | Data downloaded from data logger |
Notes: Depth = 150.0 mbsf. Date = 01 July 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.