Previous   |    Close   |    Next

Table T22. T2P Deployment 23, Hole U1322C.

Event Time
(GMT)
Description
1   Data logger started at 1 Hz
2 6:51:00 T2P on rig floor
3 7:01:01 Start lowering T2P downhole, pumps on
4 7:09:59 Stop at 491 mbsl, pumps off
5 7:12:10 Start lowering probe
6 7:17:10 Stop at 741 mbsl, pumps off
7 7:19:30 Start lowering probe
8 7:29:29 Stop at 1321 mbsl, pumps off
9 7:43:31 Start lowering probe
10 7:52:12 Stop at 1459 mbsl, pumps off
11 7:54:02 Start lowering probe
12 7:58:21 CDS lands in BHA; pumps off
13 7:58:31 Start penetration of T2P into sediment
14 8:02:56 End of T2P penetration; bit 1 m off bottom of hole
15 8:03:30 Raising BHA 4.0 m off bottom of hole
16 9:05:35 Pulling T2P uphole slowly with wireline
17 9:12:44 Stop at 1321 mbsl, pumps off
18 9:14:59 Pulling T2P uphole slowly with wireline
19 9:24:45 Stop at 741 mbsl, pumps off
20 9:26:45 Pulling T2P uphole slowly with wireline
21 9:32:17 Stop at 491 mbsl, pumps off
22 9:34:17 Pulling T2P uphole slowly with wireline
23   Data downloaded from data logger

Notes: Depth = 150.0 mbsf. Date = 01 July 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.

Previous   |    Close   |    Next   |    Top of page