Previous   |    Close   |    Next

Table T26. T2P Deployment 27, Hole U1322D.

Event Time
(GMT)
Description
1   Data logger started at 1 Hz
2 11:04:50 Stop at 491 mbsl, pumps off
3 11:15:50 Stop at 741 mbsl, pumps off
4 11:15:56 Stop at 1321 mbsl, pumps off
5 11:24:06 Stop at 1409 mbsl, pumps off
6 11:26:27 Start lowering probe
7 11:29:25 CDS lands in BHA; pumps off
8 11:29:26 Start penetration of T2P into sediment
9 11:30:20 End of T2P penetration; bit 0.8 m off bottom of hole
10 11:30:25 Raising BHA 4.0 m off bottom of hole
11 12:16:01 Pulling T2P uphole slowly with wireline
12 12:19:11 Stop at 1321 mbsl, pumps off
13 12:28:55 Stop at 741 mbsl, pumps off
14 12:35:10 Stop at 491 mbsl, pumps off
15   Data downloaded from data logger

Notes: Depth = 100.0 mbsf. Date = 02 July 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.

Previous   |    Close   |    Next   |    Top of page