Table T25. T2P Deployment 26, Hole U1322D.
Event | Time (GMT) |
Event |
---|---|---|
1 | Data logger started at 1 Hz | |
2 | 6:32:00 | T2P on rig floor |
3 | 6:56:53 | Stop at 741 mbsl, pumps off |
4 | 7:07:51 | Stop at 1321 mbsl, pumps off |
5 | 7:18:15 | Stop at 1386 mbsl, pumps off |
6 | 7:20:27 | Start lowering probe |
7 | 7:24:50 | CDS lands in BHA; pumps off |
8 | 7:26:47 | Start penetration of T2P into sediment |
9 | 7:27:48 | End of T2P penetration; bit 0.8 m off bottom of hole |
10 | 7:27:54 | Raising BHA 4.0 m off bottom of hole |
11 | 8:14:30 | Pulling T2P uphole slowly with wireline |
12 | 8:16:29 | Stop at 1321 mbsl, pumps off |
13 | 8:26:26 | Stop at 741 mbsl, pumps off |
14 | 8:32:09 | Stop at 491 mbsl, pumps off |
15 | Data downloaded from data logger |
Notes: Depth = 70.0 mbsf. Date = 02 July 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.