Table T25. T2P Deployment 26, Hole U1322D.

Event Time
(GMT)
Event
1   Data logger started at 1 Hz
2 6:32:00 T2P on rig floor
3 6:56:53 Stop at 741 mbsl, pumps off
4 7:07:51 Stop at 1321 mbsl, pumps off
5 7:18:15 Stop at 1386 mbsl, pumps off
6 7:20:27 Start lowering probe
7 7:24:50 CDS lands in BHA; pumps off
8 7:26:47 Start penetration of T2P into sediment
9 7:27:48 End of T2P penetration; bit 0.8 m off bottom of hole
10 7:27:54 Raising BHA 4.0 m off bottom of hole
11 8:14:30 Pulling T2P uphole slowly with wireline
12 8:16:29 Stop at 1321 mbsl, pumps off
13 8:26:26 Stop at 741 mbsl, pumps off
14 8:32:09 Stop at 491 mbsl, pumps off
15   Data downloaded from data logger

Notes: Depth = 70.0 mbsf. Date = 02 July 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.