Figures F1-F12
Tables T1-T6

F1. Configuration of the drill string used for logging operations.

F2. Schematic figure of rig instrumentation.

F3. RAB tool.

F4. MWD tool.

F5. ISONIC tool.

F6. ADN tool.

F7. Onboard data flow.

F8. Schematic of CORK hydrogeologic observatory.

F9. ACORK installation stages.

F10. ACORK instrument bays.

F11. ACORK plumbing schematic.

F12. Igneous texture and structure definitions.

Tables T1-T6

T1. LWD tool acronyms and units.

T2. RAB measurement resolution and depth of investigation.

T3. MWD tool acronyms and units.

T4. Thermal conductivities of half-space standards.

T5. ICP-AES parameters.

T6. ICP-AES values of reference standards.

Figures F1-F12
Tables T1-T6