Table T23. T2P Deployment 24, Hole U1322C.
Event | Time (GMT) |
Event |
---|---|---|
1 | Data logger started at 1 Hz | |
2 | 12:39:36 | Stop at 1509 mbsl, pumps off |
3 | 12:12:23 | Start lowering probe |
4 | 12:51:28 | End of T2P penetration; bit 1 m off bottom of hole |
5 | 12:51:28 | Raising BHA 4.0 m off bottom of hole |
6 | 13:51:30 | Pulling T2P uphole slowly with wireline |
7 | 14:09:00 | Stop at 741 mbsl, pumps off |
8 | 14:11:00 | Pulling T2P uphole slowly with wireline |
9 | 14:14:37 | Stop at 491 mbsl, pumps off |
10 | 14:16:37 | Pulling T2P uphole slowly with wireline |
11 | Data downloaded from data logger |
Notes: Depth = 200.0 mbsf. Date = 01 July 2005. T2P = temperature/dual pressure probe.