Table T24. T2P Deployment 25, Hole U1322D.
Event | Time (GMT) |
Description |
---|---|---|
1 | Data logger started at 1 Hz | |
2 | 2:06:25 | Start lowering T2P downhole, pumps on |
3 | 2:14:56 | Stop at 491 mbsl, pumps off |
4 | 2:21:58 | Stop at 741 mbsl, pumps off |
5 | 2:32:58 | Stop at 1321 mbsl, pumps off |
6 | 2:38:36 | Stop at 1349 mbsl, pumps off |
7 | 2:40:40 | Start lowering probe |
8 | 2:45:08 | CDS lands in BHA; pumps off |
9 | 2:46:36 | Start penetration of T2P into sediment |
10 | 2:46:51 | End of T2P penetration; bit 0.8 m off bottom of hole |
11 | 2:46:56 | Raising BHA 4.0 m off bottom of hole |
12 | 3:49:19 | Pulling T2P uphole slowly with wireline |
13 | 3:52:54 | Stop at 1321 mbsl, pumps off |
14 | 3:55:26 | Pulling T2P uphole slowly with wireline |
15 | 4:02:38 | Stop at 741 mbsl, pumps off |
16 | 4:04:48 | Pulling T2P uphole slowly with wireline |
17 | 4:08:33 | Stop at 491 mbsl, pumps off |
18 | 4:10:41 | Pulling T2P uphole slowly with wireline |
19 | Data downloaded from data logger |
Notes: Depth = 40.0 mbsf. Date = 01 July 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly