Previous   |    Close   |    Next

Table T24. T2P Deployment 25, Hole U1322D.

Event Time
(GMT)
Description
1   Data logger started at 1 Hz
2 2:06:25 Start lowering T2P downhole, pumps on
3 2:14:56 Stop at 491 mbsl, pumps off
4 2:21:58 Stop at 741 mbsl, pumps off
5 2:32:58 Stop at 1321 mbsl, pumps off
6 2:38:36 Stop at 1349 mbsl, pumps off
7 2:40:40 Start lowering probe
8 2:45:08 CDS lands in BHA; pumps off
9 2:46:36 Start penetration of T2P into sediment
10 2:46:51 End of T2P penetration; bit 0.8 m off bottom of hole
11 2:46:56 Raising BHA 4.0 m off bottom of hole
12 3:49:19 Pulling T2P uphole slowly with wireline
13 3:52:54 Stop at 1321 mbsl, pumps off
14 3:55:26 Pulling T2P uphole slowly with wireline
15 4:02:38 Stop at 741 mbsl, pumps off
16 4:04:48 Pulling T2P uphole slowly with wireline
17 4:08:33 Stop at 491 mbsl, pumps off
18 4:10:41 Pulling T2P uphole slowly with wireline
19   Data downloaded from data logger

Notes: Depth = 40.0 mbsf. Date = 01 July 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly

Previous   |    Close   |    Next   |    Top of page