After the very long core liner is in place, each technician is poised and ready to process the core quickly. Brad Julson (Laboratory Officer, IODP JRSO) (in green shirt) is ready to place the end of the core liner in a container, held by Chad Broyles (Curatorial Specialist, IODP JRSO), to drain the excess water from the liner. (Credit: Bill Crawford, IODP JRSO) [Photo ID: exp353_016]