This is a custom-made funnel to be added on top of the reentry funnel, which is already installed in the seafloor at Hole U1500B. This additional funnel was designed to prevent the growing cuttings pile from falling back into the borehole. This was a first for IODP. (Credit: Bob Aduddell, IODP JRSO) [Photo ID: exp367_224]